Strategic Plan for Geologic Mapping of Delaware 2016-2030

Project Status
Planned
Project Contact(s)

Geologic maps at the DGS are created as primary deliverables of a project and as derivatives of other projects. Primary deliverables are mainly those that are the result of outside funding sources such as the AASG-USGS cooperative StateMap. Derivative maps are those that have primary data collected for reasons other than geologic mapping can be used to create geologic maps or that geologic maps are derivative products of a project rather than the primary goal of a project. Download the PDF file for this strategic plan below.